Wrought iron
Wood & steel frame
Farm & ranch
Sliding driveway gates
LiftMaster operatorsFree on-site gate assessment - hinges, posts, and your LiftMaster or Nice gate operator checked before anything is quoted
The assessment is free and the quote is the invoice.
Get your free estimateFAAC Welding & Fabrication: The Fresno Owner’s Guide
FAAC welding and fabrication repair in Fresno typically runs $280 to $650 installed, depending on whether we’re reinforcing a cracked gate frame, rebuilding a hinge mount, or fabricating a replacement bracket that FAAC no longer stocks. We carry weld-capable steel stock, plate, and repair kits on our trucks, so most fabrication calls around Fresno are handled in a single visit. You’ll know you’ve got a fabrication problem when the gate still opens but sags, scrapes, or shakes in a way it never used to. The motor works fine. The metal it’s bolted to is what’s letting go.
Most homeowners discover this issue after a windy stretch or years of the gate’s own weight working against a thin weld. A gate that weighs 300 pounds puts constant stress on the hinge side, and in Fresno’s dry summer heat followed by damp winters, the expansion and contraction cycle finds the weakest weld and starts working it. Cody Beckman has seen FAAC swing gates near Woodward Park with hinge welds that outlasted two different motors, and others where the factory weld cracked inside eight years. It depends on the metal thickness, the gate width, and whether the original installer reinforced the hinge posts properly.
Key Takeaways
- We weld and fabricate FAAC-compatible gate frames, hinge mounts, brackets, and post reinforcements in Fresno, usually same visit
- Typical installed cost: $280 to $650, written price before any work starts
- Most FAAC fabrication failures show up as sag, scrape, or shake, not a dead panel
- We stock steel plate, stock, and weld supplies on the truck; odd FAAC-specific brackets may take 2-3 business days to source
- Welding on an automated gate requires disconnecting the motor and disengaging the operator first, which we handle as part of the job
Styles & brands we work with





Which FAAC Models This Applies To
Welding and fabrication needs on FAAC equipment fall into two groups: the gate itself and the mounting hardware that connects the operator to the gate and post. The operator models we see most often in Fresno are the FAAC 400, 402, 412, and 415 swing gate operators, plus the 391 and 770 series for slide gates. The fabrication issue usually isn’t inside the operator. It’s the steel around it.
On a FAAC swing installation, the weak points are the hinge mounting plates bolted or welded to the post, the gate frame corners near the operator attachment point, and any decorative steel that was added after the original install. Residential gates in Fresno’s older neighborhoods near Fig Garden and the Tower District often have custom welded steel frames that were built decades ago, long before the FAAC operator was added. When that operator starts pushing and pulling on fatigued steel, the gate frame cracks at the corner weld or the hinge plate tears away from the post.
Identifying what you have matters because FAAC operators pair with different gate weights and leaf sizes. Measure two things before you call us: the gate leaf width and the thickness of the steel tube or channel where the crack appeared. If it’s a hinge plate failure, look for a stamped number on the plate itself. Some aftermarket hinge plates are 1/4-inch steel while the original was 3/16-inch, and that thickness difference is exactly where a replacement either holds or fails inside five years. For FAAC-specific mounting brackets that bolt to the operator arm, OEM parts are almost always the right call. For the steel framing and hinge reinforcement, quality aftermarket steel of equal or greater thickness does the job at a lower price, and we’ll tell you which makes sense for your gate.
Signs Your FAAC Welding & Fabrication Is Failing
- The gate sags toward the latch side by half an inch or more. The hinge welds or the post itself are flexing under the gate’s weight. On a FAAC swing gate, that sag changes the geometry the operator expects, which shortens the motor’s life and stresses the arm attachment.
- You hear a new creak or popping sound when the gate travels. A cracked weld opens and closes slightly with each cycle, and the sound often gets louder in cold weather when the metal contracts. Leave it long enough in Fresno’s wet winter months and that crack grows every week.
- The gate shakes or wobbles when it stops. FAAC operators run soft-start and soft-stop logic, so a gate that slams or bounces when it reaches the limit is usually a sign the mounting plate has loosened or the anchor has cracked free of the post.
- The operator arm or bracket looks angled instead of level. When a weld stretches or a plate bends, the mechanical connection between operator and gate shifts. You’ll see it as a slight tilt at the clevis pin or where the bracket attaches to the gate frame.
- Rust streaks run down from a joint or corner. By the time you see brown lines, water has been sitting inside the tube or weld seam for months. The internal corrosion is often worse than the outside suggests, which is why we’d rather cut out the section and weld in fresh steel than patch over it.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
In Fresno, a straightforward hinge plate reinforcement or gate frame crack repair runs $280 to $420. Rebuilding a hinge mount on a stone or block post runs $380 to $550 because we often need to grind out the old anchor, set new threaded rod or plate, and re-weld the pivot. Full custom fabrication, like building a new gate leaf frame or modifying one for a different FAAC operator, starts around $500 and goes up to $650 or beyond depending on steel cost and design time.
Every fabrication job includes the same routine: we disconnect and disengage the FAAC operator before any welding starts, so stray current or heat don’t damage the board. We lay drop cloths and use a welding blanket to keep slag off your driveway or paver walkway. We grind the welds smooth, prime the repair, and paint it to match as close as the material allows. Then we reconnect the operator, set the limits and force, and run the gate through a full cycle with you watching. The written price covers all of it, and it’s the number you agreed to before we touched the gate. Our 365-Day Done Right Promise covers the fabrication work. If a weld fails or the gate sags again inside a year, we come back and make it right.
DIY or Call Us?
You can do the diagnostics safely. Run the gate and watch where the wobble or scrape originates. Put a straightedge against the hinge plate and see if it’s pulling away from the post. Check the operator bracket for cracks at the bolt holes. What you should not do is fire up a welder and attempt a repair on an automated gate while the operator is still connected. The heat alone can cook the control board, and a gate that moves unexpectedly during welding can hurt someone. We treat this part of the job as non-negotiable: power down, disengage the operator, and isolate the gate from the motor before any welding starts. That’s what our crew does on every Fresno job, and it’s a big part of why we carry welding gear on the truck instead of referring the work out.
If you’ve found the crack and you’re reasonably sure you want it fixed by someone who knows FAAC equipment, call us at (559) 785-2501. We’ll look at photos if you have them, give you a straight price range before we schedule, and then put the exact number in writing on site. If I can show you what wore out and explain why, you can decide what makes sense, that is really all this visit needs to accomplish.
FAQs
A properly reinforced hinge weld on a Fresno gate should last 15 to 20 years before it needs attention again, though unpainted or unprimed steel can start failing in under a decade from winter moisture and summer heat cycling. We prime and paint every repair we make, which is the difference between a repair that holds and one that rusts from the inside out.
Most single cracks can be repaired by grinding out the crack, welding the joint, and adding a reinforcing plate or gusset to spread the load, which costs far less than a new gate. Replacement only makes sense when the steel is rusted thin across multiple sections or the frame has been re-welded so many times the base metal is fatigued. Call (559) 785-2501 and we will give you an honest read before any money changes hands.
Most fabrication repairs in Fresno take three to five hours from disconnect to final test, including prime and paint time, and we schedule them as a single visit. Custom fabrication or rebuilding a hinge mount on a masonry post can run most of a day, and we will tell you before we start if yours falls into that category.
We stock common steel stock, plate, hinge barrels, and weld supplies on the truck, so most repairs happen the same visit. FAAC-specific brackets or operator arms that are not on the truck can usually be sourced from our local supplier within two to three business days, and we only order after you have approved the price.
If your FAAC gate has a crack, a sag, or a wobble that is getting worse, call us at (559) 785-2501 for a free estimate. We also stock parts for LiftMaster, Mighty Mule, and Ghost Controls, but our welding bench is set up for any gate that needs steel work, whatever name is on the motor.
Written by Cody Beckman, Owner, Latch and Post Gate Repair Fresno at Latch and Post Gate Repair Fresno, serving Fresno and nearby areas.